Modification date of records that were processed via running a job but no modifications were made, should not change.
When a record is included in a set and any job runs on that set, such as a normalization job, the modification date of the record is updated even if the record itself was not changed. This means the modification date is updated by design in Alma after processing or saving the record. Therefore, it is not currently possible in Analytics to run a report to check how many records were actually updated/modified in the job.
4
votes