rename "Draft" status during ledger rollover
When you run the "Rollover Ledgers" job, you can choose either "Draft" or "Active":
• If you choose "Draft," Alma creates a ledger with status "Inactive"
• If you choose "Active," Alma creates a ledger with status "Active"
"Draft" should be renamed "Inactive" in the ledger rollover menu because it creates an inactive ledger, not a draft ledger.
This is a problem because many staff mistakenly think choosing "Draft" will roll over the ledger in report mode. This is a reasonable assumption since report mode is available for PO line rollover.
2
votes
